- Thread starter
- #1,771
promiseacres
Herd Master
Possibly moving walls, kitchen door will be changed back to a previous configuration, getting down to studs, then rewiring and new plumbing, drywall. Some new posts in the basement where they changed things over the years and didn't do good job restructuring. Hoping most of the floors will just need stripped, not replaced.Getting equipment out of the weather is always a good thing. Y’all are making progress.
Planning out what y’all are going to do to the house, moving walls? Drywall? Paint? Floors? Be sure to take before, during and after pictures!