- Thread starter
- #6,461
Mike CHS
Herd Master
Jr. ropped off his dozer this afternoon so he can start first thing in the morning filling in that big hole in the middle of one of the paddocks. Neither of us thing there is enough of a berm to fill it in but there is three trees about 8" in diameter on the berm that he is going to knock down and put them in the pond. His dozer needs almost 11 feet of opening to get in so I had to have him come in the main paddock that has two 8' gates and then through two of the paddocks that are enclosed with electric poly rope and netting gates. Maisy wasn't quite sure that gigantic yellow thing was so she didn't even bother to bark.